Most of the open-wall gas work we do is in houses people already live in: an addition that needs its own heat, a garage or shop that wants a unit heater, a laundry moving upstairs. The new piping goes in while the framing is open, and it has to be done, tested and inspected before insulation and drywall cover it.
It also has to be right the first time. Once the walls are closed, changing a pipe size or adding an outlet means cutting finished drywall. So the planning happens early: which appliances are gas, where each one sits, what the total load is, and whether the house will run on standard low pressure or a 2 psi system with a regulator.
We work mainly for homeowners: on additions, garages and shops, on remodels big enough that the gas has to be replanned, and on owner-built homes. We check the existing system, rough in, test, meet the inspector, and come back after drywall to set valves and pass the final.
- Piedmont Natural Gas Advantage Partner
This is the right page if
- You are adding a room, a wing, a garage or a shop that needs gas
- A project is moving the kitchen, the laundry or the water heater
- You want stubs for future appliances like a generator, outdoor kitchen or pool heater
- Your plans call for a tankless water heater or several high-BTU appliances
- You want old gas work checked and corrected while the walls are open
- You are building your own home with gas heat, water heating, cooking or a fireplace
What we pipe for in additions and new homes
- Gas furnaces and the gas side of heat pump dual-fuel systems
- Tank and tankless water heaters
- Ranges, cooktops and wall ovens, including island cooktops
- Gas dryers
- Gas log sets and fireplace inserts
- Standby generator stubs
- Outdoor kitchen, grill and fire pit stubs
- Pool and spa heater stubs
Additions: new piping on an old system
An addition is new construction tied to an old system, and the old system was sized for the old house. Adding a bedroom wing with a second furnace, or moving to a tankless water heater during a kitchen remodel, can push the total load past what the existing trunk was designed to carry.
We check the existing piping and load before tying in. Sometimes the existing pipe is fine. Sometimes a new trunk from the meter is the cleaner answer, or a 2 psi branch with a regulator to serve the new space. The meter may also need review by the utility if the load jumps.
Remodels also uncover old work: abandoned stubs left uncapped behind cabinets, flexible connectors running through walls, and black steel that has been painted over so many times the fittings are hidden. We fix what the code requires while the walls are open.
Planning the system on paper first
Every gas system starts with a load list: each appliance, its BTU input, and where it sits relative to the meter. We add appliances you have not bought yet but probably will, because a capped stub inside an open wall is far simpler than a new run through a finished house later.
From the load and the developed lengths we choose the piping layout and size each run from the fuel gas code tables. The meter location matters too. The utility decides where the meter can go, and it should be on a wall that keeps the main trunk short and away from driveways, windows and other openings.
We give the builder the plan early, so framers can leave chases where the piping needs to pass and nobody notches a joist that the gas line needed.
Low pressure or 2 psi: choosing the system
Most older homes run at low pressure from the meter, a few inches of water column, which is the pressure the appliances use. Low-pressure systems are simple and reliable, but with long runs and big loads the pipe sizes grow quickly, especially trunk lines in black steel.
Many new homes use a 2 psi system instead. The utility delivers gas at 2 psi to the house, a single trunk carries it to a central manifold, and a line regulator at the manifold drops it to appliance pressure. From the manifold, individual CSST runs go to each appliance, one line per outlet. The higher upstream pressure means much smaller pipe can carry the same load, which suits larger homes, tankless water heaters and generators.
A 2 psi system has extra requirements. The regulator must be accessible, it needs a vent or a listed vent limiter, and there must be a shutoff valve ahead of it. The utility must agree to supply elevated pressure at that meter. And the CSST has to be bonded to the electrical grounding system, which Spartanburg County checks at the meter release inspection.
- Low pressure: simplest, larger pipe, best for compact homes and modest loads
- 2 psi with manifold: smaller pipe, home runs to each appliance, suits larger homes and big loads
- Hybrid: a 2 psi trunk to a regulator, then low-pressure branches, common on additions
Rough-in, final and the meter set
The rough-in inspection happens with the walls open. The piping is installed, supported, protected with striker plates where it passes through framing, and pressure-tested. Underground runs are tested before they are backfilled or covered by concrete, which in Spartanburg County is its own inspection point.
After drywall, the final stage is the gas meter release. Spartanburg County's residential inspection list calls for a minimum 10 psi air test on the gas lines at that stage, gas appliances in place and vented except the range, dryer and certain water heaters, every other outlet valved and capped, and the gas piping bonded. Other jurisdictions have their own lists, and we work to whichever applies.
Once the building office releases the meter, the utility schedules the meter set. That date is on their calendar, so we push the release as early as the job allows. When the meter is on, we purge the lines, light each appliance and check it.
How new construction gas piping runs
-
Plan and load calculation
We review the plans, list every gas appliance and future stub, and choose low pressure or a 2 psi system.
-
Permit and utility application
We pull the gas permit, and the builder or owner applies to the utility for service so the meter location and pressure are settled early.
-
Rough-in
Trunks, manifold, regulator and branch runs are installed with the framing open, protected and supported.
-
Test and rough inspection
The system is pressure-tested and inspected before insulation, drywall, backfill or concrete covers it.
-
Trim and meter release
After drywall we set valves, connect appliances that are in place, cap open outlets, confirm bonding and pass the meter release inspection.
-
Meter set, purge and light-off
Once the utility sets the meter, we purge the lines, light each appliance and check flame and connections.
Not sure this is the problem? Describe what is happening and we will tell you.
(864) 415-7482Permits and inspections for new construction
Gas piping on a new home is permitted under the building permit or as its own trade permit, depending on the office. Inside city limits the city building department handles it; outside, the county. Spartanburg and Cherokee counties each run their own building offices, and the cities within them can have their own.
Every office inspects at least at rough-in and before the meter is released. The utility will not set a meter on new construction until the building office releases it, so the final gas inspection is one of the items that decides move-in day.
What drives the cost of new construction piping
Every job is priced before work starts. These are the things that move the number.
- Number of outlets
- Each appliance and each future stub is a run, a valve and a test point.
- System type
- A 2 psi manifold system adds a regulator and manifold but saves on pipe size; low pressure is the reverse.
- House size and layout
- Long runs to a far-end kitchen, a detached garage or an upstairs laundry add pipe and labor.
- Underground runs
- Lines to detached buildings, generators or pool pads need trenching and their own test and inspection.
- Tie-ins on additions
- Upsizing an existing trunk or adding a regulator to carry the new load adds work at the old end of the system.
- Permit and inspection
- Fees are set by the building office; trip charges for failed or rescheduled inspections can apply.
Who supplies gas in your town
Your utility owns the main and the meter and handles gas emergencies at the meter. Everything after the meter is yours, and that is the piping we install and repair.
| Town | Natural gas | Permits |
|---|---|---|
| Spartanburg | Piedmont Natural Gas | City of Spartanburg Building Inspections; Spartanburg County Building Codes outside city limits |
| Boiling Springs | Piedmont Natural Gas | Spartanburg County Building Codes |
| Inman | Piedmont Natural Gas | City of Inman (processed by SAFEbuilt) |
| Chesnee | Piedmont Natural Gas or propane | Cherokee County Building Safety, after City of Chesnee zoning approval |
| Cowpens | Piedmont Natural Gas | Town of Cowpens (building safety by CC&I Services) |
| Gaffney | Piedmont Natural Gas | City of Gaffney Community Development; Cherokee County Building Safety outside city limits |
| Duncan | Greer CPW | Town of Duncan |
| Wellford | Greer CPW | City of Wellford |
| Lyman | Greer CPW | Town of Lyman zoning approval, then CC&I Services |
| Moore | Varies: Piedmont, Greer CPW or propane | Spartanburg County Building Codes |
| Woodruff | Piedmont Natural Gas | City of Woodruff Building Department |
| Landrum | Greer CPW | City of Landrum (start at City Hall); Spartanburg County Building Codes outside city limits |
| Campobello | Mostly propane (no gas main confirmed) | Spartanburg County Building Codes (confirm with Campobello Town Hall) |
| Roebuck | Piedmont Natural Gas | Spartanburg County Building Codes |
| Pacolet | City of Union (Union Gas) | Town of Pacolet, through its contracted building inspection firm |
| Converse | Piedmont Natural Gas | Spartanburg County Building Codes |
| Fairforest | Piedmont Natural Gas | Spartanburg County Building Codes |
| Startex | Greer CPW or Piedmont (check your bill) | Spartanburg County Building Codes |
| Reidville | Greer CPW | Town of Reidville (zoning approval, then CC&I for permits); Spartanburg County outside town limits |
| Arcadia | Piedmont Natural Gas | Spartanburg County Building Codes |
| Clifton | Piedmont Natural Gas | Spartanburg County Building Codes |
| Drayton | Piedmont Natural Gas | Spartanburg County Building Codes |
| Fingerville | Propane in most homes; check for Piedmont service | Spartanburg County Building Codes |
| Glendale | Piedmont Natural Gas (where mains reach) | Spartanburg County Building Codes |
| Gramling | Varies: propane or natural gas, by road | Spartanburg County Building Codes |
| Greer | Greer CPW | City of Greer Building and Development Standards (inside city limits) |
| Holly Springs | Varies: Greer CPW, Piedmont or propane | Spartanburg County Building Codes |
| Mayo | Varies: Piedmont where mains run, propane elsewhere | Spartanburg County Building Codes |
| Pacolet Mills | City of Union (Union Gas); confirm on your bill | Town of Pacolet, through its contracted building inspection firm |
| Pauline | Varies: Piedmont where mains run, propane elsewhere | Spartanburg County Building Codes |
| Southern Shops | Piedmont Natural Gas | Spartanburg County Building Codes |
| Una | Piedmont Natural Gas | Spartanburg County Building Codes |
| Whitestone | Varies: Piedmont where mains run, propane elsewhere | Spartanburg County Building Codes |
| Chimney Rock | Propane (no gas main) | Rutherford County Building Inspections (village zoning permit first) |
| Lake Lure | Propane (no gas main) | Rutherford County Building Inspections (Town of Lake Lure zoning permit first) |
| Forest City | Enbridge Gas North Carolina | Town of Forest City Building Inspections |
| Rutherfordton | Enbridge Gas North Carolina | Rutherford County Building Inspections (town zoning permit first for additions) |
| Spindale | Enbridge Gas North Carolina | Rutherford County Building Inspections (town zoning permit first for additions) |
| Union Mills | Mostly propane | Rutherford County Building Inspections |
| Mill Spring | Enbridge Gas North Carolina (limited); propane elsewhere | Polk County Building Inspections |
| Tryon | Enbridge Gas North Carolina | Polk County Building Inspections (Town of Tryon zoning permit first) |
| Columbus | Enbridge Gas North Carolina | Polk County Building Inspections (Town of Columbus zoning permit first) |
| Green Creek | Mostly propane | Polk County Building Inspections |
Utility territories have edges, and rural homes past the mains run on propane. Check your bill if you are unsure.
Why homeowners call Gas Guys for additions and new piping
The old system checked first
On an addition we size the new work against the piping you already have, so the old appliances do not lose pressure.
On the schedule
Gas rough-in sits between framing and drywall. We know other trades are waiting on it.
Sized for the house you will live in
We plan for the generator, the outdoor kitchen and the tankless heater now, not after the walls close.
Inspections handled
We pull the permit, test to what the inspector asks for, and meet them on site.
One call for the life of the house
The same company that roughed it in answers the phone when something goes wrong years later, around the clock.